Safety and availability come first
A cyber weakness can stop trains, affect signalling interfaces, or force degraded operation. Treatment has to respect safety cases and service windows.
CYNAPSE connects stations, depots, control centres, signalling, rolling stock interfaces, telecom, AFC, and SCADA into one governed risk and assurance model, from design through commissioning and operation.
Signalling, control centres, rolling stock, and station systems in one evidence trail that satisfies operators, integrators, and assessors.
A cyber weakness can stop trains, affect signalling interfaces, or force degraded operation. Treatment has to respect safety cases and service windows.
Integrators, subsystem suppliers, and maintainers each own a piece. The operator still has to prove the whole system is secure at handover.
Assessors expect requirements, zones, security levels, and validation evidence that trace cleanly from design to commissioning.
Each system becomes assets, zones, and interfaces in one project, so risk, exposure, and evidence stay connected to what actually runs.
RABUILD GRC carries the risk, controls, and security case. Exposure Engine ranks vulnerabilities by what the asset does. Navai Assistant guides each step.
Trace system-to-system communication paths, dependencies, trust boundaries, zones, conduits, traffic flows, and shared network services.
Assess scenarios against passenger operations, command and control, safety functions, availability requirements, and recovery priorities.
Structure requirements and evidence around IEC 62443, EN 50701, contractual obligations, and project security levels.
Connect controls, validation procedures, findings, treatment, approvals, and reports from design through commissioning and operation.
Built in: control libraries ship with RABUILD GRC. Traced: captured as project requirements and linked to the same controls, evidence, and reports.
An illustrative engagement showing how the work flows through CYNAPSE.
The integrator delivers signalling, SCADA, and telecom from three suppliers. The operator must accept the line with a security case the assessor will sign.
A security case and acceptance report tracing each EN 50701 / IEC 62443 requirement to controls, test evidence, and accepted residual risk.
See report typesField notes and playbooks written for teams that run critical systems.
A regional rail operator used IEC 62443 zoning to separate signaling and interlocking systems from a converged corporate/OT network without...
Read Knowledge ArticleConcrete supplier and lifecycle questions that put EN 50701's supply chain expectations into practice.
Read Knowledge ArticleA practical, step-by-step approach to defining zones and conduits instead of copying a generic reference diagram.
ReadWe walk through your systems, standards, and reporting needs, using the example above as a starting point.